- Dashboard
- Ontologies
- Hazelnut Ontology
- AcquisitionDate
Class
in Hazelnut Ontology
AcquisitionDate
https://ontologies.intalalab.net/ontology/hazelnut#AcquisitionDate
Description
Date on which the accession entered the collection, where YYYY is the year, MM is the month and DD is the day. Missing data (MM or DD) should be indicated with hyphens. Leading zeros are required.@en
Semantic relations
Parent classes
Related entities
Entities linked to AcquisitionDate by a tripleOutgoing triples
3| Predicate | Object |
|---|---|
| rdf:type | owl:Class |
| rdfs:subClassOf | hazelnut:AccessionDescriptor |
| rdfs:comment | Date on which the accession entered the collection, where YYYY is the year, MM is the month and DD is the day. Missing data (MM or DD) should be indicated with hyphens. Leading zeros are required.@en |
Incoming triples
0No triples point to this entity.